This PR contains the following updates:
| Package | Type | Update | Change |
|---|---|---|---|
| [gix](https://github.com/Byron/gitoxide) | dependencies | minor | `0.61` -> `0.62` |
> ❗ **Important**
>
> Release Notes retrieval for this PR were skipped because no github.com credentials were available.
> If you are self-hosted, please see [this instruction](https://github.com/renovatebot/renovate/blob/master/docs/usage/examples/self-hosting.md#githubcom-token-for-release-notes).
---
### Configuration
📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).
🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.
♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.
🔕 **Ignore**: Close this PR and you won't be reminded about this update again.
---
- [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box
---
This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzNy4yOTEuMCIsInVwZGF0ZWRJblZlciI6IjM3LjI5MS4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6W119-->
Co-authored-by: Renovate Bot <renovate@kemitix.net>
Reviewed-on: kemitix/git-next#40
Co-authored-by: renovate <renovate@noreply.kemitix.net>
Co-committed-by: renovate <renovate@noreply.kemitix.net>
Still need to figure out what tests this will need to support, and how
to configure it's behaviour. I've not ruled out creating a forge object
that is passed in rather than the functions we have now.
Closeskemitix/git-next#37
The StartRepo handler loads the config before then sending the
ValidateRepo message. However, we already have the config, so reloading
it isn't needed.
Added todo markers on sleep and dispatching of ValidateRepo where it is
used as a stop-gap until we have working webhook integration.
Add todo markers for checking valid commit messages before advancing
next branch.
If we check the status of the commit as soon as we push we get a Pass before the CI tests have even started. Wait briefly (10 seconds) to allow the CI to start and set the status to pending.
Closeskemitix/git-next#24
build(woodpecker): only run checks against next branch
Merges todo-check into main job.
Rename file build as push-next
Run lint ahead of build
build(woodpecker): rename builder as cron-docker-builder
build(woodpecker): merge release and docker into tag-created