chore(deps): update docker.io/tamasfe/taplo docker tag to v0.9.3 #18

Merged
kemitix merged 1 commit from renovate/docker.io-tamasfe-taplo-0.x into main 2024-07-31 16:13:53 +01:00
Collaborator

This PR contains the following updates:

Package Update Change
docker.io/tamasfe/taplo patch 0.9.2 -> 0.9.3

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Update | Change | |---|---|---| | docker.io/tamasfe/taplo | patch | `0.9.2` -> `0.9.3` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOC4xNS4wIiwidXBkYXRlZEluVmVyIjoiMzguMTUuMCIsInRhcmdldEJyYW5jaCI6Im1haW4iLCJsYWJlbHMiOltdfQ==-->
renovate added 1 commit 2024-07-31 13:16:18 +01:00
chore(deps): update docker.io/tamasfe/taplo docker tag to v0.9.3
Some checks failed
ci/woodpecker/pr/woodpecker Pipeline was successful
Rust / build (pull_request) Failing after 11s
ci/woodpecker/pull_request_closed/woodpecker Pipeline was successful
Rust / build (push) Failing after 10s
ci/woodpecker/push/woodpecker Pipeline was successful
6954185ef1
kemitix merged commit 6954185ef1 into main 2024-07-31 16:13:53 +01:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: kemitix/skip#18
No description provided.